Design, supply and commissioning of a Power Substation at Menengai Geothermal Prospect

Menengai geothermal prospect is approximately 210km from Nairobi. The power substation was expected to serve the power needs for high-lift water pumping station and boreholes pumps. The scope of the work included design, supply, and pre-site commissioning tests which included Transformer Voltage Ratio Test, Vector Group Test, Winding Insulation Resistance Tests, Transformer Oil Tests and other Transformer Functional Tests of a 33KV line substation of one outdoor ground mounted transformer, one H –pole mounted transformer and switchgears